电力建设2016,Vol.37Issue(8):115-121,7.DOI:10.3969/j.issn.1000-7229.2016.08.018
基于机会约束规划的储能系统跟踪光伏发电计划出力控制方法
Control Method of Energy Storage System for Tracking Photovoltaic Power Generation Output Schedule Based on Chance-Constrained Programming
摘要
关键词
光储联合发电/跟踪计划出力/机会约束/蒙特卡罗(Monte Carlo)模拟/粒子群优化算法(PSO)Key words
photovoltaic/energy storage combined power generation/tracking scheduled output/chance-constrained/Monte Carlo simulation/particle swarm optimization algorithm(PSO)分类
信息技术与安全科学引用本文复制引用
杨婷婷,李相俊,齐磊,张节潭..基于机会约束规划的储能系统跟踪光伏发电计划出力控制方法[J].电力建设,2016,37(8):115-121,7.基金项目
北京市科技新星计划项目(Z141101001814094) (Z141101001814094)
国家电网公司科技项目(No.DG71-15-039)Project supported by Beijing New-star Plan of Science and Technology (Z141101001814094) (No.DG71-15-039)
Science and Technology Project of SGCC (DG71-15-039) (DG71-15-039)