倾斜煤层露天矿纵采转横采排土场建设发展研究
Research on dump construction and development of vertical mining to horizontal mining in inclined coal seam open-pit mine
摘要
Abstract
Under the conditions of vertical mining to horizontal mining in inclined coal seam open-pit mine, with the change of mining program, it leads to the changes of inner and outer dump program, stripping transportation distance, lifting height, the area of land and material goods flow. To solve this problem, the mine builds the economic model of dump construction development. From the inner and outer row of open-pit mine planning stream, outer dump transportation, land acquisition, inner dump dynamic development and the inner and outer rows peeling lifting height and other factors, the mine optimizes the inside and outside dump construction development program in the lifecycle. The article combines the process of vertical mining to horizontal mining to carry out research in Zhundong Open-pit Mine first mining area .关键词
开采程序/排土场/建设发展/优化Key words
open-pit mine/mining sequence/dump/construction development/optimization分类
矿业与冶金引用本文复制引用
付恩三,白润才,刘光伟..倾斜煤层露天矿纵采转横采排土场建设发展研究[J].露天采矿技术,2016,31(9):5-9,5.基金项目
国家自然科学基金资助项目(51304104);中国煤炭工业协会指导性计划项目 ()