内蒙古电力技术2016,Vol.34Issue(4):11-16,6.DOI:10.3969/j.issn.1008-6218.2016.04.009
基于PSASP的牵引站电能质量预测评估
Power Quality Forecast Assessment of Traction Station Based on PSASP
郑婷婷 1王海霞2
作者信息
- 1. 国网内蒙古东部电力有限公司电力科学研究院,呼和浩特 010020
- 2. 大连理工大学电气工程学院,辽宁 大连 116024
- 折叠
摘要
Abstract
Combined with the project power quality assessment of Tong-Rang railway electrification reconstruction project of Xiliaohe, Baolongshan traction stations, which is undertook by Electric Power Research Institute of State Grid East Inner Mongolia Electric Power Company Limited recently, this paper introduces a power quality forecast assessment method based on power system analysis software package (PSASP), simulations are performed to analyze various power quality indexes of the point of common coupling (PCC) under different working conditions with traction loads station accessing to the system, then the power quality background test are performed for the substations of the traction station access point, the influence of electrified railway on the whole grid is found according to the above two aspects. Considering wind farm access to the same PCC of traction station, the wind farm stability is studied after electrified railway access to the system.关键词
电气化铁路/电能质量/预测评估/电力系统分析综合程序(PSASP)Key words
electrified railway/power quality/forecast assessment/power system analysis software package (PSASP)分类
交通工程引用本文复制引用
郑婷婷,王海霞..基于PSASP的牵引站电能质量预测评估[J].内蒙古电力技术,2016,34(4):11-16,6.