有色金属科学与工程2016,Vol.7Issue(4):103-108,6.DOI:10.13264/j.cnki.ysjskx.2016.04.018
缓倾斜矿体采场结构参数优化数值模拟
Optimization of structure parameters of gently inclined ore body by numerical simulation
摘要
Abstract
The orebody of Ningdu pyrite is gently inclined, and its stope structure parameters can hardly be determined due to the complicated geological conditions. In order to solve the problem, 130 m level stope in Ningdu Pyrite Mine was studied based on theoretical calculation and available production conditions. The op-timum scheme was determined by designing 9 mining schemes which take the span of stope, the top pillar thickness, the point pillar spacing and their size as influencing factors, and then comprehensively comparing their results through numerical stimulation of ANSYS and FLAC3D.关键词
缓倾斜矿体/采场结构/数值计算/FLAC3DKey words
gently inclined ore body/stope structure/numerical simulation/FLAC3D分类