Optimal Dispatch of Virtual Power Plant Considering Risk Adjusted Return on Capital Constraints

LIU Yangyang JIANG Chuanwen TAN Shengmin HU Jingzhe LI Qingsheng

中国电机工程学报2016,Vol.36Issue(17):4812-4812,1.
中国电机工程学报2016,Vol.36Issue(17):4812-4812,1.DOI:10.13334/j.0258-8013.pcsee.151574

Optimal Dispatch of Virtual Power Plant Considering Risk Adjusted Return on Capital Constraints

Optimal Dispatch of Virtual Power Plant Considering Risk Adjusted Return on Capital Constraints

LIU Yangyang 1JIANG Chuanwen 1TAN Shengmin 1HU Jingzhe 1LI Qingsheng2

作者信息

  • 1. Shanghai Jiao Tong University
  • 2. Power Network Planning Research Center of Guizhou Power Grid Corporation
  • 折叠

摘要

关键词

RAROC/virtual power plant/optimal dispatch/economic capital/conditional cash flow at risk (CCFaR)

Key words

RAROC/virtual power plant/optimal dispatch/economic capital/conditional cash flow at risk (CCFaR)