中国电机工程学报2016,Vol.36Issue(18):4904-4910,7.DOI:10.13334/j.0258-8013.pcsee.152689
考虑恢复路径充电时间的机组启动次序决策方法
A New Method to Determine Non-blackstart Units Restoration Sequence With Consideration of Charging Time of Restoration Paths
冯丽 1金黎明 1张同尊 1雷筱权 2李长城 2张沛 2王小君 2和敬涵2
作者信息
- 1. 国网重庆市电力公司,重庆市 渝中区 400014
- 2. 北京交通大学电气工程学院,北京市 海淀区 100044
- 折叠
摘要
Abstract
The primary goal of system restoration is to quickly restore all of generation units and reduce customer outage time. Determination of non-blackstart units’ restoration sequence is a critical step of system restoration process. The traditional methods to determine units start-up sequence mostly only considered the time characteristics of generation units, while ignoring the charging time of restoration paths. The paper propose a new method to determine restoration sequence of non-blackstart units with consideration of charging time of restoration paths for achieving shortest restoration time. Case studies on a 23 buses test system indicate that this new method takes less time to restore non-blackstart units comparing with the traditional approach without consideration of charging time of branches.关键词
大停电/电力系统恢复/机组启动次序/路径充电时间/恢复时间Key words
blackout/power system restoration/generation units start-up sequence/charging time of restoration paths/restoration time分类
信息技术与安全科学引用本文复制引用
冯丽,金黎明,张同尊,雷筱权,李长城,张沛,王小君,和敬涵..考虑恢复路径充电时间的机组启动次序决策方法[J].中国电机工程学报,2016,36(18):4904-4910,7.