| 注册
首页|期刊导航|电工技术学报|计及弃风的风电场最优装机容量

计及弃风的风电场最优装机容量

姜欣 陈红坤 回俊龙 缪芸 向铁元

电工技术学报2016,Vol.31Issue(18):160-168,9.
电工技术学报2016,Vol.31Issue(18):160-168,9.

计及弃风的风电场最优装机容量

Optimal Installed Capacity of Wind Farm Considering Wind Power Curtailment

姜欣 1陈红坤 1回俊龙 2缪芸 3向铁元1

作者信息

  • 1. 武汉大学电气工程学院武汉 430072
  • 2. 国网吉林省电力有限公司长春供电公司长春 130000
  • 3. 国网江苏省电力公司经济技术研究院南京 210008
  • 折叠

摘要

Abstract

A novel optimization method about wind farm installed capacity considering wind power curtailment is proposed under the existing power environment. Under the conditions to meet the system static security constraints, the proposed optimization model aims at maximal net income of wind farm and takes the wind power curtailment into account. In addition, the impact of hourly peaking characteristics of wind power on the curtailment is introduced to the optimization model under different scenarios. Accordingly, the more reasonable installed capacity in statistical significance is obtained. Finally, the particle swarm optimization algorithm based on stochastic simulation is used to solve the model. The IEEE 30 bus system is tested to show the effects of curtailment, time scale, on-grid price and other factors on the installed capacity based on the annual and hourly wind speed distribution characteristics.

关键词

弃风/机会规划约束/风电调峰特性/风电接纳能力/最优装机容量

Key words

Wind power curtailment/chance-constrained programming/wind power peaking characteristic/wind power capacity/optimal installed capacity

分类

信息技术与安全科学

引用本文复制引用

姜欣,陈红坤,回俊龙,缪芸,向铁元..计及弃风的风电场最优装机容量[J].电工技术学报,2016,31(18):160-168,9.

基金项目

国家重点基础研究发展计划(973计划)资助项目(2012CB215201)。 ()

电工技术学报

OA北大核心CSCDCSTPCD

1000-6753

访问量0
|
下载量0
段落导航相关论文