| 注册
首页|期刊导航|港工技术|一条装船作业线负责二个泊位的装船的通过能力估算

一条装船作业线负责二个泊位的装船的通过能力估算

杜韬

港工技术2016,Vol.53Issue(5):22-25,4.
港工技术2016,Vol.53Issue(5):22-25,4.DOI:10.16403/j.cnki.ggjs20160506

一条装船作业线负责二个泊位的装船的通过能力估算

Shipment Capacity Estimate of Two Berths Through One Ship-loading Line

杜韬1

作者信息

  • 1. 中交第一航务工程勘察设计院有限公司,天津 300222
  • 折叠

摘要

Abstract

The technical requirements for one shipment option have been analyzed, which must satisfy the shipment of two berths through one ship-loading line. Based on the theory of queues, a new method is proposed to estimate annual shipment capacity. The calculation results shows that the annual shipment capacity of two-berth-one-line option is 1.25~1.9 times higher than that of one-berth-one-line option. The basic conditions are summarized, which will support the new process.

关键词

通过能力/二个泊位/一条装船作业线/装船工艺/排队论/方法

Key words

shipment capacity/two berths/one ship-loading line/ship-loading process/theory of queues/method

分类

交通工程

引用本文复制引用

杜韬..一条装船作业线负责二个泊位的装船的通过能力估算[J].港工技术,2016,53(5):22-25,4.

港工技术

1004-9592

访问量0
|
下载量0
段落导航相关论文