| 注册
首页|期刊导航|港工技术|遮帘式板桩码头前轨道梁的优化设计探讨

遮帘式板桩码头前轨道梁的优化设计探讨

赵雁飞 张立国 杨攀博

港工技术2016,Vol.53Issue(5):57-59,3.
港工技术2016,Vol.53Issue(5):57-59,3.DOI:10.16403/j.cnki.ggjs20160514

遮帘式板桩码头前轨道梁的优化设计探讨

Optimum Design of Front Rail Bearer on Curtained Sheet Pile Wharf

赵雁飞 1张立国 1杨攀博1

作者信息

  • 1. 中交第一航务工程勘察设计院有限公司,天津 300222
  • 折叠

摘要

Abstract

Based on Tangshan port Caofeidian harbor coal terminal phase-3 project, the design process of ship-loader's rail bearer has been researched to discuss an innovative design option of the rail bearer on wharf structure. Better economic effect is achieved by setting supporting piers on the leading girder of curtained sheet pile, reducing the distance between two piers that minimizes the section and reinforcement of the front rail bearer, and improving the way of reinforcement. The research results will provide a reference for similar projects.

关键词

遮帘式板桩码头/轨道梁/优化设计

Key words

curtained sheet pile wharf/rail bearer/optimimum design

分类

交通工程

引用本文复制引用

赵雁飞,张立国,杨攀博..遮帘式板桩码头前轨道梁的优化设计探讨[J].港工技术,2016,53(5):57-59,3.

港工技术

1004-9592

访问量0
|
下载量0
段落导航相关论文