| 注册
首页|期刊导航|中国医疗设备|PDCA循环管理在核磁共振水冷系统维护维修中的应用

PDCA循环管理在核磁共振水冷系统维护维修中的应用

丛中华 张影

中国医疗设备2016,Vol.31Issue(10):146-148,3.
中国医疗设备2016,Vol.31Issue(10):146-148,3.DOI:10.3969/j.issn.1674-1633.2016.10.048

PDCA循环管理在核磁共振水冷系统维护维修中的应用

Application of PDCA Cycle Management in Maintenance and Troubleshooting of the Cooling System of Nuclear Magnetic Resonance Devices

丛中华 1张影1

作者信息

  • 1. 首都医科大学附属北京佑安医院医学工程中心,北京 100069
  • 折叠

摘要

Abstract

This paper introduced the PDCA (Plan-Do-Check-Action) cycle management and its application on maintenance and troubleshooting of the cooling system of NMR (Nuclear Magnetic Resonance) devices. After a series of improvement measures, the cooling system availability rate was improved and the working hours of NMR devices were guaranteed. Consequently, better work efifciency and economic beneifts were achieved and comprehensive management of the hospital was enhanced.

关键词

PDCA/核磁共振设备/水冷系统/鱼骨图

Key words

PDCA/nuclear magnetic resonance devices/cooling systems/ifshbone diagram

分类

医药卫生

引用本文复制引用

丛中华,张影..PDCA循环管理在核磁共振水冷系统维护维修中的应用[J].中国医疗设备,2016,31(10):146-148,3.

中国医疗设备

OACSTPCD

1674-1633

访问量0
|
下载量0
段落导航相关论文