山东煤炭科技Issue(9):31-32,2.DOI:10.3969/j.issn.1005-2801.2016.09.014
浅析薄岩柱下巷道跨越施工技术
Analysis on the construction technology crossing roadway under thin rock pillar
张新建1
作者信息
- 1. 河南龙宇能源股份有限公司陈四楼煤矿,河南永城 476600
- 折叠
摘要
Abstract
For 21210 consecutive return air connection on the north and west wing track down the hill (overhead in inclined lane) corresponding minimum cross section rock pillars is 3.73 m, in order to ensure the safety of tunnel crossing construction period, by using fractional charge, divide second initiation, the anchor net supporting construction process, and the reinforcement method of theoretical analysis, and the deformation monitoring, thus ensuring the BoYanZhu be crossing the roadway under the safe use of the roadway drivage and the continuity of construction.关键词
跨越/最小岩柱/施工工艺/理论分析Key words
across minimum rock pillars/the construction technology/the theoretical analysis分类
矿业与冶金引用本文复制引用
张新建..浅析薄岩柱下巷道跨越施工技术[J].山东煤炭科技,2016,(9):31-32,2.