山东煤炭科技Issue(9):61-63,3.DOI:10.3969/j.issn.1005-2801.2016.09.029
孤岛工作面沿空掘巷位置研究
Research on the position of gob-side entry in the isolated island working face
路文斌 1裴宝地1
作者信息
- 1. 山东能源枣庄矿业集团公司柴里煤矿,山东枣庄 277517
- 折叠
摘要
Abstract
12209 working face of a coal mine is isolated island working face, and both side of working face is goaf. In this paper, In this paper, FLAC 3D is used to simulate the stress concentration caused by mining of adjacent working face. The width of coal pillar is calculated, and the optimum position of the tunnel is simulated. and numerical simulation leads to the vertical stress distribution on the coal pillar and the optimum position of the tunnel is determined. Reserved coal pillar made the roadway small deformation and maintain the stability of the roadway.关键词
孤岛工作面/沿空掘巷/应力分布/留巷位置/煤柱宽度Key words
isolated island workface/gob-side entry driving/stress distribution/gob-side location/simulation coal pillar width分类
矿业与冶金引用本文复制引用
路文斌,裴宝地..孤岛工作面沿空掘巷位置研究[J].山东煤炭科技,2016,(9):61-63,3.