焊管2016,Vol.39Issue(9):34-38,5.DOI:10.19291/j.cnki.1001-3938.2016.09.008
JCOE成型机主油缸更换方案及调整方法
Replacment Scheme and Adjustment Method for JCOE Forming Machine Master Cylinder
高财禄 1李洪臣 1程明1
作者信息
- 1. 中油宝世顺(秦皇岛)钢管有限公司, 河北 秦皇岛 066206
- 折叠
摘要
Abstract
In order to avoid some problems occurred in JCOE forming machine master cylinder replacement process,which were caused by unreasonable replacement scheme,such as long time maintenance,great labor intensity,poor forming quality, even safety accidents,and other problems. The early replacement scheme was optimized,summed up a time-and-labor saving forming machine master cylinder replacement scheme and forming machine adjustment method. The using results showed that this scheme not only saved operation time,reduced repair labor intensity,avoided safety risks,but also acquired good application effects during the process of forming adjusting after the cylinder replacement.关键词
直缝焊管/JCOE成型机/主油缸/更换方案/调整方法Key words
longitudinal submerged welded pipe/JCOE forming machine/master cylinder/replacement scheme/adjustment method分类
能源科技引用本文复制引用