可再生能源2016,Vol.34Issue(10):1441-1448,8.
基于弃风弃光同步消纳的荷网源协调思路与实时消纳电量评估方法研究
Study on load-grid-generation coordination method and accommodation increment assessment based on synchronization consumptive of abandoned wind power and solar
摘要
Abstract
In order to support solving the problem of abandoned wind power and solar,this paper proposed a matched method for real-time wind power and solar accommodation and assessment of power quantity accommodation.The research starts with the analysis of energy abandoned reason and the policies already implemented,according to the research about assessment index such as abandoned and accommodation power quantity,including the index values,calculation,physical meaning and application methods.Finally,this article proposed wind power and solar accommodation increment assessment method can be used in plan accommodation and direct control accommodation,and a case is also given for showing how does the match method and assessment operation.关键词
荷网源协调/可再生能源接纳能力/弃风弃光电量/消纳增量Key words
load-grid-generation coordination/renewable power accommodation capacity/abandoned wind power and solar/wind power and solar accommodation increment分类
能源科技引用本文复制引用
王振宇,李俊,许朝阳,万长瑛..基于弃风弃光同步消纳的荷网源协调思路与实时消纳电量评估方法研究[J].可再生能源,2016,34(10):1441-1448,8.基金项目
国家科技支撑计划(2015BAA01B04). (2015BAA01B04)