For doubly-fed induction generator,a new method is proposed to realize wind power LVRT by using combination circuits of Crowbar and dynamic voltage restorer (DVR).When grid faults,by using the complete compensation method control strategy of DVR to compensate for voltage grid failure,maintain a constant maintain a constant.And grid faults in relatively serious,put into Crowbar with DVR simultaneously,Crowbar can limit over current of doubly-fed induction generator in rotor side during the fault.Finally,using the PSCAD/EMTDC environment as the simulation platform.The simulation results indicate that,when grid faults,put into the DVR with Crowbar current,can grid voltage recovery normal voltage,and can effectively limit over current of the rotor side,thereby improve the ability of LVRT of doubly-fed induction generator.

关键词

风电机组/动态电压恢复器/完全补偿法/Crowbar/低电压穿越

Key words

doubly-fed induction generator/dynamic voltage restorer/complete compensation method/Crowbar/low voltage ride through

分类

能源科技

引用本文复制引用

吕丽荣..基于Crowbar与动态电压恢复器提高风力机低电压穿越[J].可再生能源,2016,34(10):1467-1472,6.

基金项目

内蒙古建筑职业技术学院课程标准专项基金研究课题(YC1518). (YC1518)

可再生能源

OA北大核心CSTPCD

1671-5292

访问量0
|
下载量0
段落导航相关论文