中国粉体技术2016,Vol.22Issue(5):6-9,4.DOI:10.13732/j.issn.1008-5548.2016.05.002
卧式行星球磨和立磨中试粉磨线的功耗
Energy consumption of grinding process in horizontal planet mill and vertical mill
摘要
Abstract
This paper studied the power consumption of the horizontal planetary mill.The pilot plant test of horizontal planetary mill and the vertical mill was respectively carried out,and than the power consumption was contrasted through measuring each equipment power consumption,calculating the cumulative wass percentage at 45 μm partieal size and Blaine specific surface area,computing specific power consumption of 300 m2/kg specific surface area by KHD empirical formula.The results show that,when feldspar and barite are grinded,the horizontal planetary mill stand-alone power consumption is slightly higher than the vertical mill stand-alone power consumption,however,the total power consumption of horizontal planetary mill pilot is less than that of the vertical mill pilot,in addition,the total power consumption is gradual decrement with the revolution speed of the horizontal planetary mill increasing.关键词
卧式行星磨/立磨/功耗/中试实验Key words
horizontal planetary mill/vertical mill/power consumption/pilot plant test分类
通用工业技术引用本文复制引用
马娜,叶旭初..卧式行星球磨和立磨中试粉磨线的功耗[J].中国粉体技术,2016,22(5):6-9,4.基金项目
长江学者和创新团队发展计划,编号:IRT1146 ()
国家重点基础研究发展计划(973计划),编号:2009CB623100. (973计划)