| 注册
首页|期刊导航|人民黄河|坝高超200 m土石坝坝坡稳定风险控制标准

坝高超200 m土石坝坝坡稳定风险控制标准

李斌

人民黄河2016,Vol.38Issue(11):104-107,4.
人民黄河2016,Vol.38Issue(11):104-107,4.DOI:10.3969/j.issn.1000-1379.2016.11.025

坝高超200 m土石坝坝坡稳定风险控制标准

Research on Slope Stability Risk Control Standards for 300 m High Earth and Rockfill Dam

李斌1

作者信息

  • 1. 中交天津港湾工程研究院,天津300222; 港口岩土工程技术交通行业重点实验室,天津300222; 天津市港口岩土工程技术重点实验室,天津300222
  • 折叠

摘要

Abstract

With the development of earth and rockfill dams construct technology, earth and rockfill dams have built higher and higher, high earth and rockfill dam design has been used design specifications which only apply to the construction of 200m below and the design specifi⁃cation of earth and rockfill dam needs to be improved. For high earth and rockfill dam, it calculated earth and rockfill dam slope stability safety factor under different dam heights and different slope ratios based on the ratio safety margin and made slope stability safety factor change variation of high earth and rockfill dam clear. This paper took allowed slope stability reliable indicator of high earth and rockfill dam of 4. 2 as design standard, calculated the ratio safety margin of traditional method and reliability method and conducted linear regression. The re⁃sult shows that the slope stability safety factor of high earth and rockfill dams slide stability safety factor of 1.6 is on the same level with relia⁃bility 4.2 under normal conditions. Practical construction of high earth and rockfill dams proves the safety factor 1.6 is correct and reasonable.

关键词

高土石坝/坝坡稳定/相对安全率/允许可靠度指标/安全系数

Key words

high earth and rockfill dam/slope stability/ratio of safety margin/allowed reliability/safety factor

分类

建筑与水利

引用本文复制引用

李斌..坝高超200 m土石坝坝坡稳定风险控制标准[J].人民黄河,2016,38(11):104-107,4.

基金项目

国家重点基础研究发展计划项目(2013CB036403)。 ()

人民黄河

OA北大核心CSTPCD

1000-1379

访问量0
|
下载量0
段落导航相关论文