上海城市规划Issue(5):65-70,6.
城市环卫设施布局的主要问题与应对策略*--基于宁波的规划实践
The Key Issue of Urban Environmental Sanitation Layout and its Solution:A Case Study of Planning Practice in Ningbo
摘要
Abstract
At this stage, the external environment and direction of urban environmental sanitation construction is varying, which demands the new requirements for the environmental sanitation layout. Taking Ningbo as a case, this study analyzes the problems faced during the planning formulation. The key problems are three contradictions including the contradiction between demand growth and site selection dififculty, the contradiction between standard and practical demand, and the contradiction between the intensive use of land and single function. Taking the venous industry park as a center, this study suggests to construct a new system of refuse disposal facilities, refuse transfer stations and sanitation service stations by adjusting the model of waste collection and transportation. In addition, this study explicates the new land use control standard for the facilities like refuse transfer stations in order to reduce the conlficts between neighborhoods and achieve concentrated use of resources.关键词
环卫设施/规划布局/宁波Key words
Sanitation facility/Planning layout/Ningbo分类
建筑与水利引用本文复制引用
叶晓东,胡红,黄叶华..城市环卫设施布局的主要问题与应对策略*--基于宁波的规划实践[J].上海城市规划,2016,(5):65-70,6.基金项目
宁波市规划局和宁波市城管局共同委托项目(2013年)。 ()