昆嵛山水库对文登抽水蓄能电站下水库施工期洪水及初期蓄水的影响研究

李永林 梁标 胡紫航 原红红

西北水电Issue(5):57-62,6.
西北水电Issue(5):57-62,6.DOI:10.3969/j.issn.1006-2610.2016.05.014

昆嵛山水库对文登抽水蓄能电站下水库施工期洪水及初期蓄水的影响研究

Study on Impacts by Kunyushan Reservoir on Flood During Construction and Initial Impoundment of Lower Reservoir,Wendeng Pumped Storage Power Plant

李永林 1梁标 2胡紫航 1原红红1

作者信息

  • 1. 山东文登抽水蓄能有限公司,山东省威海市 264205
  • 2. 中国电建集团北京勘测设计研究院有限公司,北京 100024
  • 折叠

摘要

Abstract

At the upstream of the lower reservoir of the pumped storage power plant in Wendeng, Shandong, is Kunyushan reservoir which is uncompleted. The uncompleted reservoir largely impacts the flood during construction and the initial impoundment as well of the pumped stor-age power plant. In accordance with the hydrological data of the Kunyushan reservoir and of the section between the Kunyushan reservoir and the lower reservoir of the pumped storage power plant, in the paper, impacts on the flood control during construction and initial impoundment period of the lower reservoir by Kunyushan reservoir are determined through analysis and calculation.

关键词

昆嵛山水库/文登抽水蓄能电站/施工期洪水/初期蓄水

Key words

Kunyushan reservoir/Wendeng pumped storage power plant/flood during construction/initial impoundment