工业技术创新2016,Vol.3Issue(5):969-972,4.DOI:10.14103/j.issn.2095-8412.2016.05.038
富水砂砾层长距离大直径顶管减阻施工技术
Resistance Reduction Construction Technology of Long Distance and Large Diameter Pipe in Rich Water Sand and Gravel Layer
谢尚兵1
作者信息
- 1. 中铁隧道集团二处有限公司,河北廊坊,065201
- 折叠
摘要
Abstract
At present, pipe jacking adopts injected resistance reduction, so frictional resistance of outer tube wall mainly depends on the injection effect. Unfulfillment of resistance reduction brings out disadvantages of project. Factors in layers of rich water sand and gravel, such as jacking injection grouting resistance reduction for long distance and large diameter pipe, reinforcement of receiving well, and portal sealing are analyzed, and feasible methods are carried out. Finally, a success practice of once top through in sand layer is realized, indicating referential significance for similar projects afterwards.关键词
长距离大直径/富水砂层/减阻/施工技术Key words
Long Distance and Large Diameter/Rich Water Sand/Drag Reduction/Construction Technique分类
建筑与水利引用本文复制引用