| 注册
首页|期刊导航|南方电网技术|±800 kV滇西北至广东特高压工程极导线与接地极线共塔电磁环境研究

±800 kV滇西北至广东特高压工程极导线与接地极线共塔电磁环境研究

李倩 廖民传 王学军 潘春平 汪晶毅 陈云云 刘俊翔

南方电网技术2016,Vol.10Issue(9):49-54,6.
南方电网技术2016,Vol.10Issue(9):49-54,6.DOI:10.13648/j.cnki.issn1674-0629.2016.09.008

±800 kV滇西北至广东特高压工程极导线与接地极线共塔电磁环境研究

Research on the Electromagnetic Environment of Polar Wires and Ground Electrode Wires on the Same Tower of ± 800 kV Dianxibei to Guangdong UHVDC Project

李倩 1廖民传 2王学军 1潘春平 1汪晶毅 1陈云云 1刘俊翔3

作者信息

  • 1. 中国能源建设集团广东省电力设计研究院有限公司,广州510663
  • 2. 直流输电技术国家重点实验室 南方电网科学研究院,广州510663
  • 3. 广州供电局有限公司电力试验研究院,广州510000
  • 折叠

摘要

Abstract

In highly urbanized areas,erecting ± 800 kV polar wires and ground electrode wires on the same tower is the best choice to solve the shortage of transmission line corridors and scarcity of land resources. However,there are few researches on the electro-magnetic environment of this type of tower at home and abroad. In this paper,the conventional calculation method is expanded to con-sider the shielding effect of ground electrode wires to the electromagnetic environment of polar wires. Taking the ± 800 kV Dianxibei to Guangdong UHVDC Project as example,the audible noise,radio interference,total field strength above ground and ion current den-sity under horizontally and vertically arranged modes of same tower hybrid transmission lines are discussed. The results show that the total electric field strength above ground of same tower hybrid transmissin lines is less than the DC line,and the transmission line corri-dors can be compressed about 44% by using the vertical arrangement of same tower hybrid transmissin lines.

关键词

特高压直流/电磁环境/可听噪声/无线电干扰/电场强度

Key words

HVDC/electromagnetic environment/audible noise/radio interference/electric field strength

分类

信息技术与安全科学

引用本文复制引用

李倩,廖民传,王学军,潘春平,汪晶毅,陈云云,刘俊翔..±800 kV滇西北至广东特高压工程极导线与接地极线共塔电磁环境研究[J].南方电网技术,2016,10(9):49-54,6.

南方电网技术

OA北大核心CSTPCD

1674-0629

访问量0
|
下载量0
段落导航相关论文