| 注册
首页|期刊导航|中国电机工程学报|A Short-term Joint Operation Method of Small and Large Hydropower Plants Under Small Hydropower Uncertainty

A Short-term Joint Operation Method of Small and Large Hydropower Plants Under Small Hydropower Uncertainty

WU Huijun CHENG Chuntian WU Xinyu LI Xiufeng CAI Huaxiang

中国电机工程学报2016,Vol.36Issue(21):S20-S20,1.
中国电机工程学报2016,Vol.36Issue(21):S20-S20,1.DOI:10.13334/j.0258-8013.pcsee.151500

A Short-term Joint Operation Method of Small and Large Hydropower Plants Under Small Hydropower Uncertainty

A Short-term Joint Operation Method of Small and Large Hydropower Plants Under Small Hydropower Uncertainty

WU Huijun 1CHENG Chuntian 1WU Xinyu 1LI Xiufeng 2CAI Huaxiang2

作者信息

  • 1. Dalian University of Technology
  • 2. Yunnan Electric Power Dispatching Center
  • 折叠

摘要

关键词

small hydropower/large hydropower/scenario analysis/peak shaving/optimal operation

Key words

small hydropower/large hydropower/scenario analysis/peak shaving/optimal operation

引用本文复制引用

WU Huijun,CHENG Chuntian,WU Xinyu,LI Xiufeng,CAI Huaxiang..A Short-term Joint Operation Method of Small and Large Hydropower Plants Under Small Hydropower Uncertainty[J].中国电机工程学报,2016,36(21):S20-S20,1.

中国电机工程学报

OA北大核心CSCDCSTPCD

0258-8013

访问量0
|
下载量0
段落导航相关论文