压力容器2016,Vol.33Issue(10):66-73,8.DOI:10.3969/j.issn.1001-4837.2016.10.010
AP1000主设备大型锻件不符合项分析与预防
Analysis and Prevention of AP1000 Main Equipment Heavy Forgings Nonconformance
马蒙 1金鑫 1袁旭光 1梅雪强1
作者信息
- 1. 湖南桃花江核电有限公司,湖南 益阳 413000
- 折叠
摘要
Abstract
The AP1000 main equipment forging manufacturing is the most important in the nuclear island main equipment such as reactor pressure vessel and steam generator,whose quality and schedule are im-pacted by the forgings in large extent.The nonconformance is happened frequently in the forging manufac-turing process.This paper analyzed the causes of the nonconformance,and proposed the disposal and pre-caution.The reference is provided in avoiding and reducing nonconformance efficiently,making the sched-ule of the forging manufacture shortly.It is a good reference for the main equipment purchasers to control the nonconformance in equipment supervision.关键词
AP1000主设备/锻件/不符合项/分析与处理Key words
AP1000 main equipment/forgings/nonconformance/analysis and prevention分类
机械制造引用本文复制引用
马蒙,金鑫,袁旭光,梅雪强..AP1000主设备大型锻件不符合项分析与预防[J].压力容器,2016,33(10):66-73,8.