| 注册
首页|期刊导航|人民长江|复杂岩溶区深埋长隧洞线路比选优化实践

复杂岩溶区深埋长隧洞线路比选优化实践

张海平 王家祥 刘承新 陈长生 李银泉

人民长江2016,Vol.47Issue(22):51-54,59,5.
人民长江2016,Vol.47Issue(22):51-54,59,5.DOI:10.16232/j.cnki.1001-4179.2016.22.010

复杂岩溶区深埋长隧洞线路比选优化实践

Optimization of route selection for deep buried long tunnel in complex karst area

张海平 1王家祥 1刘承新 1陈长生 1李银泉1

作者信息

  • 1. 长江三峡勘测研究院有限公司 武汉,湖北 武汉430074
  • 折叠

摘要

Abstract

In the construction of deep buried long tunnel in complex karst region, geological disasters such as water burst, wa-ter inrush, mud burst and so on are prone to occur and may lead to a series of groundwater environmental problems. Therefore, the tunnel should be constructed in non ( or weak) karst area to minimize the drainage of groundwater. Taking a deep buried long tunnel in complex karst area of water diversion project in central Yunnan Province as an example, we judged the development de-gree of the deep karst on macro scale and defined the accurate position of underground watershed in the study area based on hydrological and engineering geological survey and mapping, together with technical methods of drilling, groundwater tracer test and earth electromagnetic sounding. The results provided a reasonable, accurate and feasible basis for the optimization of tunnel route .

关键词

复杂岩溶区/深埋长隧洞/钻探/地下水示踪试验/大地电磁测深

Key words

complex karst area/deep buried long tunnel/drilling/earth electromagnetic sounding/groundwater tracing test

分类

天文与地球科学

引用本文复制引用

张海平,王家祥,刘承新,陈长生,李银泉..复杂岩溶区深埋长隧洞线路比选优化实践[J].人民长江,2016,47(22):51-54,59,5.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文