| 注册
首页|期刊导航|人民长江|鄂北调水工程PCCP管道安装测量监理质量控制

鄂北调水工程PCCP管道安装测量监理质量控制

肖彦 冯小庆 万建成

人民长江2016,Vol.47Issue(22):64-67,4.
人民长江2016,Vol.47Issue(22):64-67,4.DOI:10.16232/j.cnki.1001-4179.2016.22.013

鄂北调水工程PCCP管道安装测量监理质量控制

Quality control for supervision of PCCP pipeline installation and measurement in North Hubei Water Transfer Project

肖彦 1冯小庆 2万建成1

作者信息

  • 1. 长江勘测规划设计研究有限责任公司 工程建设咨询总承包公司,湖北 武汉430010
  • 2. 鄂北地区水资源配置工程建设与管理局筹,湖北 武汉430071
  • 折叠

摘要

Abstract

According to the characteristics of large PCCP pipeline installation in pilot production of water resources allocation project in North Hubei and considering the repeated problems in pipeline installation and measurement, we focus on introducing quality supervision and checking methods of measurement supervision. In the process of supervision, the combination of theory and practical check can effectively control the measurement tolerances of trench depth, gradient, pipeline length and installation elevation in pipeline construction and ensure the quality indexes of pipeline installation. The experiences can be used in the fol-low-on installation measurement of PCCP pipeline and as reference for measurement supervision of similar water transfer project.

关键词

PCCP管道/安装检测/生产性试验项目/水资源配置工程/鄂北地区

Key words

PCCP pipeline/installation check/production pilot project/water resources allocation project/North Hubei area

分类

建筑与水利

引用本文复制引用

肖彦,冯小庆,万建成..鄂北调水工程PCCP管道安装测量监理质量控制[J].人民长江,2016,47(22):64-67,4.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文