| 注册
首页|期刊导航|铁道科学与工程学报|益马高速典型地层桩基自平衡试验研究

益马高速典型地层桩基自平衡试验研究

付学问 雷金山 叶志凌 邓立志 陆海平

铁道科学与工程学报2016,Vol.13Issue(11):2163-2167,5.
铁道科学与工程学报2016,Vol.13Issue(11):2163-2167,5.

益马高速典型地层桩基自平衡试验研究

Studies on a self-balanced test for typical stratigraphic piles of YIMA Freeway

付学问 1雷金山 2叶志凌 2邓立志 3陆海平3

作者信息

  • 1. 湖南益马高速公路建设开发有限公司,湖南 长沙410008
  • 2. 中南大学 土木工程学院,湖南 长沙410075
  • 3. 湖南中大设计院有限公司,湖南 长沙410075
  • 折叠

摘要

Abstract

Pile self-balanced testing method is a novel and effective method for the detection of pile foundation with flexibility to load and unload,without space constraints,and with advantages of large load capacity,short cycle and good economic benefit.In the paper,based on YIMA freeway typical stratigraphic,the self-balanced testing method was used to study the friction pile bearing capacity of pile foundation of Da Ligang Bridge and the regularities of distribution of pile tip resistance and side friction resistance under load conditions at all levels.The results show that the thickness of mud closed to pile has certain effect on side friction resistance.When the thick-ness is enough,the side friction resistance can be reduced by 50 percent.Therefore,it is a major factor that in-fluences the side friction resistance.

关键词

典型地层/摩擦桩/自平衡法/侧摩阻力/桩端阻力/土压力盒

Key words

typical formation/friction pile/self-balance method/pile tip resistance/side friction resistance/earth pressure box

分类

交通工程

引用本文复制引用

付学问,雷金山,叶志凌,邓立志,陆海平..益马高速典型地层桩基自平衡试验研究[J].铁道科学与工程学报,2016,13(11):2163-2167,5.

基金项目

国家自然科学基金资助项目(50678175);益马高速建设科技计划项目 ()

铁道科学与工程学报

OA北大核心CSCDCSTPCD

1672-7029

访问量0
|
下载量0
段落导航相关论文