广东电力2016,Vol.29Issue(11):36-41,80,7.DOI:10.3969/j.issn.1007-290X.2016.11.008
燃气-蒸汽联合循环余热锅炉滑压运行
Sliding Pressure Operation of Gas-steam Combined Cycle Heat Recovery Boiler
陈耿 1杨承 2蒋敬丰 1马晓茜2
作者信息
- 1. 华南理工大学 电力学院,广东广州 510640
- 2. 广东省能源高效清洁利用重点实验室 华南理工大学,广东广州510640
- 折叠
摘要
Abstract
During its operation process,the combined cycle unit will deviate from designed conditions,such as rise of exhaust gas temperature,change of exhaust gas flow,and so on,but the steam turbine will still keep its original sliding pressure curve mode,so it will deviate from optimal parameters in actual operation. This paper uses MATLAB to establish a simula-tion calculation model for heat recovery boiler-steam turbine for optimizing sliding pressure parameters and compares chan-ges of optimal sliding pressure curves under different exhaust gas conditions of the gas-steam turbine. Results indicate that when efficiency of the gas-steam turbine decreases and the unit runs with the mode of controlling exhaust gas temperature of the turbine,the optimal sliding pressure curve of the boiler will move up. Meanwhile,decline of efficiency of the turbine will cause rise of exhaust gas flow and increase of output of the turbine,which will reduce influence of efficiency decline of the turbine on decrease of output of the combined cycle unit.关键词
联合循环/余热锅炉/仿真/滑压曲线Key words
combined cycle/heat recovery boiler/simulation/sliding pressure curve分类
能源科技引用本文复制引用
陈耿,杨承,蒋敬丰,马晓茜..燃气-蒸汽联合循环余热锅炉滑压运行[J].广东电力,2016,29(11):36-41,80,7.