Abstract

Currently, the management of the temporary earth wire mainly rely on manual management in most hydropower stations, so there is a big risk on assembling and disassembling temporary earth wire. For managing the temporary earth wire more effectively and safely, Qingyuan Pumped Storage Power Station optimizes the system structure in accordance with the actual situation, and manages the temporary earth wire electronically by applling the radio frequency identification technology. Through monitoring and judging the status of temporary earth line in real time, the management system can effectively reduce the risk of misuse of the ground wires and protect the safety of people and equipment.

关键词

抽水蓄能电站/临时接地线/管理

Key words

pumped storage power station/earth wire/management

分类

建筑与水利

引用本文复制引用

吴迪,黄文浩..清远抽水蓄能电站临时接地线管理系统介绍[J].广东水利水电,2016,(8):56-60,5.

广东水利水电

1008-0112

访问量2
|
下载量0
段落导航相关论文