某大型水利枢纽汛期分期方案研究
Study on a Hydraulic Project Flood Season Staging Program
摘要
Abstract
The study of flood stage constitutes an important basis for the research of reservoir water level dynamic control in flood season. By using of both cause analysis method and mathematical statistics, the paper made an analysis to the occurrence law of rainstorms and floods in reservoir area of a large hydro project, and proposed a flood staging method of dividing flood season into such three stages as pre-flood season, major flood season and post-flood season. The research results can provide a fundamental basis on utilization of rainwater resources for both the hydro project and related project in the same river basin.关键词
大型水利枢纽/汛期分期/成因分析/数理统计Key words
Large Hydro Project/Flood Stage/Cause Analysis/Mathematical Statistics分类