| 注册
首页|期刊导航|广东水利水电|某大型水利枢纽汛期分期方案研究

某大型水利枢纽汛期分期方案研究

赵璧奎 黄本胜 邱静 谭超 罗舒燕

广东水利水电Issue(9):37-42,6.
广东水利水电Issue(9):37-42,6.

某大型水利枢纽汛期分期方案研究

Study on a Hydraulic Project Flood Season Staging Program

赵璧奎 1黄本胜 1邱静 1谭超 1罗舒燕1

作者信息

  • 1. 广东省水利水电科学研究院,广东省水动力学应用研究重点实验室,河口水利技术国家地方联合工程实验室,广东 广州 510610
  • 折叠

摘要

Abstract

The study of flood stage constitutes an important basis for the research of reservoir water level dynamic control in flood season. By using of both cause analysis method and mathematical statistics, the paper made an analysis to the occurrence law of rainstorms and floods in reservoir area of a large hydro project, and proposed a flood staging method of dividing flood season into such three stages as pre-flood season, major flood season and post-flood season. The research results can provide a fundamental basis on utilization of rainwater resources for both the hydro project and related project in the same river basin.

关键词

大型水利枢纽/汛期分期/成因分析/数理统计

Key words

Large Hydro Project/Flood Stage/Cause Analysis/Mathematical Statistics

分类

建筑与水利

引用本文复制引用

赵璧奎,黄本胜,邱静,谭超,罗舒燕..某大型水利枢纽汛期分期方案研究[J].广东水利水电,2016,(9):37-42,6.

基金项目

广东省水利科技创新项目(2011-06、2012-02、2014-06) (2011-06、2012-02、2014-06)

广东水利水电

1008-0112

访问量0
|
下载量0
段落导航相关论文