摘要
Abstract
the combined water soil mixing piles in consideration of three people island anti wear dike, the application of the culvert engineering of soil -cement mixing pile are introduced pile arrangement, calculation, technical indicators and after testing, to provide the reference for the similar and related engineering application.关键词
水泥土搅拌桩/施工技术/检测结果换算/软土地基Key words
soil-cement mixing pile/The construction technology/The test results conversion/Soft soil foundation