露天采矿技术2016,Vol.31Issue(11):16-18,22,4.DOI:10.13235/j.cnki.ltcm.2016.11.004
抚顺西露天矿东区开采14段站移设工程
14 stage station shift project in the eastern area of Fushun West Open-pit Mine
尹有德1
作者信息
- 1. 抚顺矿业集团有限责任公司 东露天矿,辽宁 抚顺 113003
- 折叠
摘要
Abstract
This article introduces the operation process of 14 stage station north shift project in the eastern area of Fushun West Open-pit mine. From the economy and technology aspect, the author analyzes and discusses 14 stage station north shift project and presents the suitable mining scheme.关键词
露天矿/开采/移设工程/剥离Key words
East open-pit Mine/West open-pit mine/eastern area mining/shift project/stripping分类
矿业与冶金引用本文复制引用
尹有德..抚顺西露天矿东区开采14段站移设工程[J].露天采矿技术,2016,31(11):16-18,22,4.