| 注册
首页|期刊导航|农业工程学报|寒冷地区多级垂直流人工湿地系统设计及氮磷去除效率

寒冷地区多级垂直流人工湿地系统设计及氮磷去除效率

王勇 张宝莉 汤灿 卢靓 刘灏 吴文良 陈清

农业工程学报2016,Vol.32Issue(23):218-225,8.
农业工程学报2016,Vol.32Issue(23):218-225,8.DOI:10.11975/j.issn.1002-6819.2016.23.030

寒冷地区多级垂直流人工湿地系统设计及氮磷去除效率

Multistage vertical-flow constructed wetlands and removal efficiency of nitrogen and phosphorus in cold area

王勇 1张宝莉 1汤灿 2卢靓 1刘灏 1吴文良 1陈清1

作者信息

  • 1. 中国农业大学资源与环境学院,北京 100193
  • 2. 北京通州京环环境服务有限公司,北京 101100
  • 折叠

摘要

Abstract

In order to solve the problems of low efficiency and unstable operation of constructed wetland in winter, 2 multistage vertical-flow constructed wetlands (MVCWs) systems were designed and constructed for treating the sewage of the residents in Fangshan District, Beijing City. Through the engineering design, adding extra carbon (C) source for denitrification effect, and increasing phosphorus (P) adsorption matrix, the system stability and the removal efficiency of pollutants were improved. MVCWs I was designed for the hydraulic loading of 70 m3/d at Houshiyang Village sewage treatment station in Fangshan District; MVCWs II was designed for the adjustable hydraulic loading, and the equipment was the controllable connection of 6 units with the same size for treating the pollutants under different hydraulic loading, different extra C source amount added, and different operation mode. Results showed that in MVCWsⅠ, the removal rate of chemical oxygen demand (COD) was 77.0%-93.7%, and the average removal rate was 87.3%; the removal rate of total phosphorus (TP) was 75.8%-97.0%, and the average removal rate was 91.9%; the total nitrogen (TN) removal rate was 26.4%-97.2%, and the average removal rate was 68.9% in the full year operation. MVCWsⅠhad a stable operation throughout the year, although the removal rate of organic pollutants was decreased in winter. MVCWsⅡ was added with the wood chips as the extra C source in the third-stage unit, and added with the aluminum ball to enhance the adsorption of P in the fourth-stage unit, which operated from July to November in 2015. With the semi-batch operation mode and the hydraulic load of 0.5 m3/(m2·d), the average removal rate of COD, TN and TP for MVCWsⅡ were 92.5%, 53.8% and 77.2%, respectively. After adding 62 kg wood chips, in MVCWsⅡ, the COD/TN increased from 0.93 to 1.85, and the TN removal rate increased by 15.6% compared with adding the 31 kg wood chips in the anaerobic stage. By adding extra C source and the design conducive to nitrogen removal, the efficient removal of N in winter without plants could be improved. Although wood chips supplement to MVCWsⅡ could improve microbe conditions and intensify nitrogen removal function, the effluent COD concentration was increased in the unit added with C source. Excessively adding extra C source would cause the COD in the sewage to increase by remaining C, and the C could not be fully used in denitrification, so the extra C source should be added with right amount. In this research, the COD of the water at the outlet increased with the increase of the wood chip added in the unit. However, the average removal rate of the COD in system was not significantly different under different C source adding amount. It was proved that the fourth-stage aerobic unit played an important role in the degradation of the remaining C, and also reflected the necessity of the fourth-stage unit. The vertical-flow constructed wetland multistage reasonable unit design can effectively guarantee the various pollutants’ removal efficiency, and improve the efficiency in N removal in the winter without plants. In the MVCWs system design, adding C source for denitrification in the anaerobic stage makes the artificial wetland system run stably for a full year. The study results can provide the reference for the application of constructed wetland in northern China.

关键词

湿地/污水///垂直流人工湿地/外加碳源/反硝化/寒冷地区

Key words

wetlands/wastewater/nitrogen/phosphorus/vertical-flow constructed wetland/external carbon source/denitrification/cold area

分类

资源环境

引用本文复制引用

王勇,张宝莉,汤灿,卢靓,刘灏,吴文良,陈清..寒冷地区多级垂直流人工湿地系统设计及氮磷去除效率[J].农业工程学报,2016,32(23):218-225,8.

基金项目

国家国际科技合作专项项目“人工湿地在我国北方污水处理中的合作研究”(2011DFG93510) (2011DFG93510)

农业工程学报

OA北大核心CSCDCSTPCD

1002-6819

访问量0
|
下载量0
段落导航相关论文