| 注册
首页|期刊导航|铁道标准设计|高速铁路超长大桥梁设计研究

高速铁路超长大桥梁设计研究

金莉

铁道标准设计2017,Vol.61Issue(1):34-40,7.
铁道标准设计2017,Vol.61Issue(1):34-40,7.DOI:10.13238/j.issn.1004-2954.2017.01.008

高速铁路超长大桥梁设计研究

Design and Research on Super Major Bridges of High-speed Railway

金莉1

作者信息

  • 1. 铁道第三勘察设计院集团有限公司,天津 300142
  • 折叠

摘要

Abstract

The design of super major bridges is of great representativeness applied to high-speed railway. Due to the multiple cross-line work-point, the complex plane and elevation relation of the line, the switch throat area and viaduct station on the bridge, and the complicated structural design, there remain huge potentials in perspective of special bridge structures and design innovations on super major bridges. This paper takes Tianjin super major bridge of Beijing-Shanghai high-speed railway as an example to briefly introduce the construction environment, main technical standards, geological conditions and the types of bridge piers and abutments of the bridge. Meanwhile, it also addresses the design features such as long-span continuous beams, turnout zone bridges, station platform beams, and focuses on the special structures of this bridge, and summarizes the experiences in the design of bridges on Beijing-Shanghai high-speed railway, which could provide references for future optimization and innovation of high-speed railway construction in China.

关键词

高速铁路/天津特大桥/建设条件/特殊结构/设计研究

Key words

High-speed railway/Tianjin super major bridge/Construction conditions/Special structure/Design research

分类

交通工程

引用本文复制引用

金莉..高速铁路超长大桥梁设计研究[J].铁道标准设计,2017,61(1):34-40,7.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文