探矿工程-岩土钻掘工程2016,Vol.43Issue(11):45-47,3.
伊拉克鲁迈拉油田优化固井技术
Application of Optimized Cementing Technology in Rumaila Oil Field
戴小毛1
作者信息
- 1. 大庆钻探工程公司钻井技术服务一公司,黑龙江大庆163400
- 折叠
摘要
Abstract
Because of low fracturing pressure in Rumaila formation, leakage is easy to happen in the intermediate casing ce-menting procedure;the shale development in production layer leads to irregular chambering and shrunk holes; cementing displacement efficiency is low and it is difficult to guarantee cementing quality.In late well cementing construction, the for-mation characteristics are analyzed starting from several key factors that affect the cementing quality to optimize the techni-cal measures of plugging and by cementing design software to optimize the number of casing centralizer;through indoor test, inhibited weighted drilling fluid is optimized to control and adjust the performance parameters of drilling fluid used in unsta-ble shale layer, the API fluid loss is controlled at 4mL and density 1.35g/cm3.A set of comprehensive cementing technol-ogy is formed, the cementing qualified ratio reaches to more than 80%in field tests.关键词
堵漏/固井/钻井液/扶正器/鲁迈拉油田Key words
plugging/cementing/drilling fluid/casing centralizer/Rumaila oil field分类
石油、天然气工程引用本文复制引用
戴小毛..伊拉克鲁迈拉油田优化固井技术[J].探矿工程-岩土钻掘工程,2016,43(11):45-47,3.