This article proposed an optimal peak load-shifting plan,in order to solve the low-efficiency and low-reliablility problems in the current power grid management.Based on the features of consumption custom of electric,the article analysed the gragh of historical load characters and timing,formulating a reasonable project on scheme shutdown,including differentiation shutdown,to reduce the lost electric in the process and maxmize the whole economic benefits of both suppliers and demanders.The shutdown plan of a certain city was selected as an example to verify the rationality and effectiveness of the project.关键词
计划停电/负荷特性/电量损失/错峰Key words
scheme shutdown/load character/loss of quantity of electricity/peak load shifting分类