华东交通大学学报2016,Vol.33Issue(6):43-49,7.
基于洞内空气质量监测的长大隧道施工通风系统改进
Improvement of Ventilation System during Large-Tunnel Construction Based on Air Quality Testing
肖粤秀 1杨新安 1江星宏 1何知思1
作者信息
- 1. 同济大学道路与交通工程教育部重点实验室,上海 201804
- 折叠
摘要
Abstract
Ventilation is an important aided system of the multiple working faces in the long and large tunnel construction, which is the necessary condition to ensure the health of the working staff and the running of elec-tromechanical equipment. By testing air quality of the fifth ventilation stage during Bibanpo tunnel construction in site, this study showed that the short supply of air volume, low speed of wind, and high content of dust and CO were the main problems. Extra jet fan and axial fan were installed and the management and maintenance to the ventilation equipment were reinforced to improve the ventilation system. Measured results showed that those measures improved the effects of ventilation and the air quality during tunnel construction. But further improve-ments are needed according to the results.关键词
长大隧道/多工作面施工/通风/空气质量监测Key words
long tunnel/multiple working faces/ventilation/testing of air quality分类
交通工程引用本文复制引用
肖粤秀,杨新安,江星宏,何知思..基于洞内空气质量监测的长大隧道施工通风系统改进[J].华东交通大学学报,2016,33(6):43-49,7.