山东煤炭科技Issue(12):7-9,3.DOI:10.3969/j.issn.1005-2801.2016.12.004
工作面端头区稳定性分析及端头支架选用
Stability analysis of working face end region and selection of end support of Sima mine
王锴波1
作者信息
- 1. 山西长治潞安集团司马煤业有限公司,山西长治 047105
- 折叠
摘要
Abstract
In this paper, taking the Sima mine 1215 working face as the actual engineering background, analyzed the stability of fully mechanized top coal caving face end zone from the surrounding rock structure of the end zone, coal pillar structure and coal pillar reinforcement way . The arc triangle formed after roof collapsed was as large structure in the end zone, the end support was as a small structure. According to the method ensuring the stability of the large and small structures, the end bracket which is suitable for the characteristics of Sima mine is preliminarily selected.关键词
综采/端头/稳定性/支架Key words
fully mechanized/stability/support分类
矿业与冶金引用本文复制引用
王锴波..工作面端头区稳定性分析及端头支架选用[J].山东煤炭科技,2016,(12):7-9,3.