Abstract

The study region of this paper was the typical segments of hydraulic engineering disturbance from Hongjiadu Dam hydropower station to Wujiangdu hydropower station in the middle and downstream of Wujiangdu Dam. The MIKE11 model was used to simulate and calculate monthly average runoff and water levels of damsite over the three periods, i. e. , before construction of Wujiangdu hydropower sta-tion, during the single-reservoir operation after construction of Wujiangdu hydropower station, and joint control with the upstream and downstream hydropower stations after its construction, and the cumulative effects of cascade hydropower development of Wujiang main stream on hydrological regimes. The results showed that, the hydropower station construction and joint operation made the discharge homogeneously and water level increase after the implementation of cascade hydropower development plan. The homoge-nizing effect reduced the flood flow and compensated the dry period flow. The increase of the water level increased the capacity of the reservoir area. The control of cascade hydropower had some ecological im-pacts on ecological water requirement of egg reproduction of downstream fishes.

关键词

水电站/梯级开发/水文情势/MIKE11/累积影响

Key words

hydropower station/cascade development/hydrological regime/MIKE11/cumulative effect

分类

建筑与水利

引用本文复制引用

曹亚丽,贺心然,姜文婷..水电梯级开发水文情势累积影响研究[J].水资源与水工程学报,2016,27(6):20-25,6.

基金项目

国家自然科学基金项目(51179053) (51179053)

国家科技重大专项(2012ZX07506-006-05&2012ZX07506-007-01) (2012ZX07506-006-05&2012ZX07506-007-01)

水资源与水工程学报

OACSCDCSTPCD

1672-643X

访问量0
|
下载量0
段落导航相关论文