中国电力2017,Vol.50Issue(2):70-74,5.DOI:10.11930/j.issn.1004-9649.2017.02.070.05
一次调频设置问题引起的机组甩负荷的实例及分析
Case Study on Load Rejection Caused by Configuration Problems of Primary Frequency Regulation
摘要
关键词
火电机组/甩负荷/数字电液系统/模型/实时仿真/一次调频Key words
thermal generation unit/load rejection/digital electronic hydraulic system/model/real-time simulation/primary frequency regulation分类
信息技术与安全科学引用本文复制引用
盛锴,陈彦峰,周年光..一次调频设置问题引起的机组甩负荷的实例及分析[J].中国电力,2017,50(2):70-74,5.基金项目
This work is supported by Science and Technology Project of State Grid Hunan Electric Power Corporation (No.5216A515002D).国网湖南省电力公司科技项目(5216A515002D) (No.5216A515002D)