| 注册
首页|期刊导航|岩土工程学报|平行盾构开挖离心机模拟试验研究

平行盾构开挖离心机模拟试验研究

缪林昌 王非 吴宏伟 吕虎

岩土工程学报2017,Vol.39Issue(2):373-379,7.
岩土工程学报2017,Vol.39Issue(2):373-379,7.DOI:10.11779/CJGE201702023

平行盾构开挖离心机模拟试验研究

Centrifugal model tests on excavation of twin parallel tunnels

缪林昌 1王非 1吴宏伟 2吕虎2

作者信息

  • 1. 东南大学交通学院,江苏 南京 210096
  • 2. 香港科技大学土木学院,香港
  • 折叠

摘要

Abstract

The excavation construction of twin parallel tunnels is simulated by using centrifugal model tests. The internal stress and deformation variation of shield structure of the existing tunnel and the ground surface settlement are studied owing to excavation of the new adjacent tunnel. The research results show that: (1) The ground surface settlement relates with the tunnel excavation process, and the settlement trough range is independent of the tunnel excavation process. (2) The shield structure side of the existing tunnel near to the new constructing tunnel is subjected to tension and the bending moment at the same side of the existing tunnel has a negative increment, the transverse diameter increases, and the lateral earth pressure decreases at the same side of the shield near to the new construction tunnel. However, the vertical diameter of the shield structure of the existing tunnel is not affected. (3) The crown earth pressure of the just completed shield firstly decreases and then increases during the sequent excavation process. (4) The proposed method for the stratigraphic structure by the authors can be used to analyze the internal stress and deformation of the shield structure for tunnel construction.

关键词

平行盾构隧道/临近开挖/离心模型试验

Key words

twin parallel tunnel/adjacent excavation/centrifugal model test

分类

建筑与水利

引用本文复制引用

缪林昌,王非,吴宏伟,吕虎..平行盾构开挖离心机模拟试验研究[J].岩土工程学报,2017,39(2):373-379,7.

基金项目

国家自然科学基金项目(51578147,5127099) (51578147,5127099)

岩土工程学报

OA北大核心CSCDCSTPCD

1000-4548

访问量0
|
下载量0
段落导航相关论文