摘要

Abstract

The method of "Blocking ground water and limiting discharge" is widely applied to deal with the groundwater of the tunnel with high groundwater table. However, it is inevitable to have the influence on the drawdown of the groundwater table when drains perpetually, if the level exceeds a certain limit. It will cause the deterioration of ecological environment. The operational period of a tunnel is usually so long that it is essential to real-time control the groundwater table. The calculation method of water inflow of surrounding rock and the lining of the tunnel was determined based on the contrastive analysis, groundwater dynamics method and Darcy's law, and then according to the seepage continuity, the back analysis method of groundwater table was obtained. Under the conditions of the tunnel flow rate, the permeability coefficient of surrounding rock and lining were known, the groundwater table can be obtained. It was proved to be effective by case study and the comparison of real project. This method can provide a reference to the groundwater table of the tunnel for operational phase as well as the basis of groundwater balance protection.

关键词

隧道/地下水位/涌水量/地下水平衡

Key words

tunnel/groundwater table/water inflow/groundwater balance

分类

交通工程

引用本文复制引用

尹泉,程盼,傅鹤林,周林瑄,刘畅..运营期隧道地下水位变化情况估算[J].铁道科学与工程学报,2017,14(2):303-307,5.

基金项目

国家自然科学基金资助项目(51538009,51478477,51508562,51508563) (51538009,51478477,51508562,51508563)

铁道科学与工程学报

OA北大核心CSCDCSTPCD

1672-7029

访问量0
|
下载量0
段落导航相关论文