电测与仪表2017,Vol.54Issue(3):42-47,6.
基于抗扰时间的优质电力园区技术方案优化方法
Optimization method of technical solutions in premium power park based on process immunity time
余光明 1郑颖1
作者信息
- 1. 国网重庆市供电公司铜梁区供电分公司,重庆402560
- 折叠
摘要
Abstract
Premium Power Park ( PPP) is a technical solution to effectively solve the regional high-quality power supply problems.The technical scheme optimization method is the premise of planning and constructing of power park.To meet various power requirements of different customers, the concept of process immunity time and sag immu-nity is lead up in this paper.Considering the response characteristic of process to sag, physical parameters and their variation principle, and acceptable resulting status of customer, the classification methods of power supply quality for customers' demands and power quality level in power park are proposed.On this basis, optimization model is estab-lished by constraints of customers' requirement and taking the minimum cost as the objective.And its corresponding algorithm based on Tabu search method is researched.The proposed method is applied to a typical PPP and it is proved to be accurate and valid.The simulation results show that this method can meet each customer' s demand, meanwhile, ensures the minimum of total investment.And it provides a guarantee for engineering construction of PPP.关键词
优质电力园区/工业过程/抗扰度/过程抗扰时间/可接受后果状态/技术方案/优化模型Key words
premium power park/industrial process/sag immunity/process immunity time/acceptable consequence status/technical solution/optimization model分类
信息技术与安全科学引用本文复制引用
余光明,郑颖..基于抗扰时间的优质电力园区技术方案优化方法[J].电测与仪表,2017,54(3):42-47,6.