广州医药2017,Vol.48Issue(1):32-35,4.DOI:10.3969/j.issn.1000-8535.2017.01.008
FAST-FIX全内缝合系统治疗膝关节半月板后角损伤中期疗效观察
Arthroscopic repair posterior horn of the meniscus with FAST-FIX suture system:a mid-term clin-ical results report
摘要
Abstract
Objective To evaluate a 3-year mid-term clinical results of FAST-FIX suture system in arthroscopic meniscal posterior horn repair. Methods Clinical results of 46 patients with meniscal tear who underwent posterior horn of the meniscus repair using the FAST-FIX suture system from January 201 1 to April 2013 were retrospectively analyzed. There were 27 males and 19 females,age 17~42 years old,average 23. 5 ±8. 22 years old. There were 25 left knee and 21 right knee and 33 red zone injury and 13 red-white zone injury,8 of which were accompanied by anterior cruciate ligament injury. Clinical healing of the meniscus was assessed by Lysholm scores (35. 73 ±11. 28)points,IKDC scores (37. 26 ±13. 17) points and Tegner scores (3. 3 ±1. 7 ) points before operation. Results The average follow-up period was 46. 3 months (range:36-59 months). The clinical healing rate was 91. 3%. Healing failure occurred to 4 patients and 2 of which had a meniscus noose after operation and were confirmed surgical failure in reoperation. Mean Lysholm scores were (86. 3 1 ± 11. 89),IKDC scores (82. 9 ±13. 44)and Tegner scores (5. 9 ±1. 9)in 3 years after operation for all 46 cases. The differences between the preoperative and postoperative scores in three type scores were statistically significant (P<0. 05 ). Conclusion Arthroscopic posterior horn of the meniscus repair with the FAST-FIX suture system may provide good 3-year mid-term clinical results after operation.关键词
半月板损伤/关节镜/FAST-FIX缝合系统Key words
Meniscus injury/Arthroscope/FAST-FIX suture system引用本文复制引用
杨健齐,魏鲁青,张健平,曾昭勇..FAST-FIX全内缝合系统治疗膝关节半月板后角损伤中期疗效观察[J].广州医药,2017,48(1):32-35,4.基金项目
广东省佛山市医学科研基金项目 ()