首页|期刊导航|水利水电技术|阿尔塔什水利枢纽深孔工作弧门突扩突跌门槽体型试验研究

阿尔塔什水利枢纽深孔工作弧门突扩突跌门槽体型试验研究

孟涛 章晋雄 潘旭东 王志刚

水利水电技术2017,Vol.48Issue(1):88-93,100,7.
水利水电技术2017,Vol.48Issue(1):88-93,100,7.DOI:10.13928/j.cnki.wrahe.2017.01.017

阿尔塔什水利枢纽深孔工作弧门突扩突跌门槽体型试验研究

Experimental study on shape of sudden lateral enlargement and vertical drop for radial gate slot of deep outlet for Altash Water Control Project

孟涛 1章晋雄 2潘旭东 3王志刚2

作者信息

  • 1. 新疆新华叶尔羌河流域水利水电开发有限公司,新疆喀什844000
  • 2. 中国水利水电科学研究院,北京 100038
  • 3. 新疆水利水电勘测设计研究院,新疆乌鲁木齐830000
  • 折叠

摘要

Abstract

Altash Water Control Project is the largest leading reservoir within Yarkant River Basin,for which the type of sudden lateral enlargement and vertical drop is adopted for the slot of the radial working gate.The operation water head of the working gate is high with large flow rate,while lager risk from cavitation and cavitation erosion is there in the area of the slot.Taking the study and verification of the hydraulic and cavitation characteristics of the shape of sudden lateral enlargement and vertical drop for the slot of the radial working gate for the No.1 deep outlet of Altash Water Control Project as the objective,the optimized flow patterns within the area of the gate with the shape of sudden lateral enlargement and vertical drop are compared with three schemes.The experiment result shows that the water-wing intensity is effectively reduced after adjusting the diffusion angle for the diffusion section of the side-wall to 1.273 °,and then the hydrodynamic pressure and the flow cavitation characteristics at the slot section are obviously improved.The shape of sudden lateral enlargement and vertical drop for gate slot with better flow pattern and anti-cavitation characteristics proposed herein provides some experiences and references for the design of the gate shape for the radial working gate of deep outlet with high water head and large flow rate in the days to come.

关键词

工作弧门/门槽/突扩突跌体型/体型优化/模型试验/阿尔塔什水利枢纽

Key words

radial working gate/gate slot/shape of sudden lateral enlargement and vertical drop/shape optimization/model experiment/Altash Water Control Project

分类

建筑与水利

引用本文复制引用

孟涛,章晋雄,潘旭东,王志刚..阿尔塔什水利枢纽深孔工作弧门突扩突跌门槽体型试验研究[J].水利水电技术,2017,48(1):88-93,100,7.

基金项目

国家自然科学基金项目(51279216) (51279216)

水利水电技术

OA北大核心CSCDCSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文