水利水电科技进展2017,Vol.37Issue(1):43-49,7.DOI:10.3880/j.issn.1006-7647.2017.01.008
美国退役坝拆除背景与原因剖析
Anatomy of dam removal in the United States of America
摘要
Abstract
In order to present the actual situation of dam removal in the United States of America( USA) comprehensively and objectively, a reference search and a special survey were carried out. Based on a review of the background and status of dam removal activities, the causes for dam removal in the United States were analyzed, namely environmental, safety, and economic factors. The cases study shows that dam removal in the USA aims to eliminate the safety risk of aging dams, restore anadromous fish migration, and save non-cost-effective expenditure. Dam decommissioning is an important stage in dam lifecycle management. Dam removal in the USA does not operate with the belief that dam construction is unnecessary. Currently, hydropower remains the largest renewable energy source in the USA. The concepts and experience of dam decommissioning in the USA can provide references for reservoir demotion and retirement management in China.关键词
拆坝/退役坝/河流修复/案例研究/美国Key words
dam removal/decommissioning dams/river restoration/case study/USA分类
建筑与水利引用本文复制引用
胡苏萍,徐灿灿,李弘..美国退役坝拆除背景与原因剖析[J].水利水电科技进展,2017,37(1):43-49,7.基金项目
国家自然科学基金(51679151) (51679151)
中央级公益性科研院所基本科研业务费专项(Y915005) (Y915005)