两种溃坝模型在唐家山堰塞湖溃决模拟中的对比

李相南 陈祖煜

水利水电科技进展2017,Vol.37Issue(2):20-26,7.
水利水电科技进展2017,Vol.37Issue(2):20-26,7.DOI:10.3880/j.issn.1006-7647.2017.02.004

两种溃坝模型在唐家山堰塞湖溃决模拟中的对比

Comparison of two models for back analysis of dam breach of Tangjiashan Barrier Lake

李相南 1陈祖煜1

作者信息

  • 1. 中国水利水电科学研究院岩土工程研究所,北京 100048
  • 折叠

摘要

Abstract

Based on measured data of the dam breach of Tangjiashan Barrier Lake, the process of the dam breach was analyzed using the BREACH model and the DB-IWHR model developed by the China Institute of Water Resources and Hydropower Research. A sensitivity analysis of the two models to different parameters was also performed. Results show that, using the parameters of the dam, the two models can both reflect the flooding process induced by the dam breach;the calculated results of the peak flow are more sensitive to the input parameters of the downstream slope and porosity in the BREACH model; the DB-IWHR model improves the calculation of the erosion parameter and downstream water depth, resulting in calculated results less sensitive to the input parameters;and the DB-IWHR model provides software in the Excel format, with a high stability in numerical analysis, which is transparent, self-explanatory, and friendly to practitioners.

关键词

堰塞湖/BREACH模型/DB-IWHR模型/溃坝洪水分析/唐家山

Key words

barrier lake/BREACH model/DB-IWHR model/dam breach-induced flood analysis/Tangjiashan

分类

建筑与水利

引用本文复制引用

李相南,陈祖煜..两种溃坝模型在唐家山堰塞湖溃决模拟中的对比[J].水利水电科技进展,2017,37(2):20-26,7.

基金项目

国家重点基础研究发展计划(973计划)(2013CB036402) (973计划)

国家自然科学基金青年基金(51309260) (51309260)

水利水电科技进展

OA北大核心CSCDCSTPCD

1006-7647

访问量0
|
下载量0
段落导航相关论文