现代防御技术2017,Vol.45Issue(1):173-180,8.DOI:10.3969/j.issn.1009-086x.2017.01.029
大型k/N系统维修资源优化配置模型
Optimal Configuration Model for Large k/N System Maintenance Resources
摘要
Abstract
Aiming at the configuration of large k/N system maintenance resources,an optimized configuration model is established.Firstly,the m-batch size maintenance policy is proposed based on the characteristics of large k/N system,and an operational availability model of k/N system is set based on the maintenance policy.Some key targets of operational availability are calculatedand modified adopting MQ/M/c queueing theory.Then,an optimized configuration model of multi-maintenance resources of intricate equipment composed of kinds of k/N system is established,and multi-maintenance resources are optimized by using marginal effect analysis.Finally,analysis of one instance is conducted to verify the proposed models,and the results show that the models are feasible and effective,and can provide a decision-making support for equipment maintenance support personnel.关键词
批量m维修策略/k/N系统/维修资源/排队理论/边际效应/使用可用度Key words
m-batch size maintenance policy/k/N system/maintenance resources/queuing theory/marginal effect/operational availability分类
军事科技引用本文复制引用
武高卫,杨江平,王永攀,侯晓东..大型k/N系统维修资源优化配置模型[J].现代防御技术,2017,45(1):173-180,8.