中国电机工程学报2017,Vol.37Issue(5):1389-1400,12.DOI:10.13334/j.0258-8013.pcsee.152656
主动配电网分层鲁棒规划模型及其求解方法
A Bi-level Robust Planning Model of Active Distribution Network and Its Solution Method
摘要
Abstract
The renewable energies have been promoted worldwide,however,the distribution company will face huge challenges due to the uncertain penetration of distributed generations.This paper focused on the upgrading of the existing distribution network based on the network topology planning including active management devices,e.g.On-load tap changer (OLTC),electrical storage system (ESS),capacitor banks (CB),and static VAR compensation (SVC) in order to accommodate uncertain development of distributed generations (DG) and load demand increase.Firstly,the time-varying uncertainty model and the selection rule of scenarios were addressed.Secondly,robust planning model of active distribution network whose objective includes curtailment cost of wind power,photovoltaic power and load was proposed.Then,the investment level and operation level were associated together in the programming model,and some methods,e.g.the second order cone (SOC) were applied to transform the original model to mixed integer SOC programming problem to quickly solve.Finally,the proposed model was verified by the modified IEEE 33 node system.关键词
主动配电网/鲁棒规划/分布式电源/不确定性/二阶锥规划Key words
active distribution network/robust planning/distributed generation/uncertainty/second order cone (SOC)programming分类
信息技术与安全科学引用本文复制引用
高红均,刘俊勇,魏震波,苏韵掣..主动配电网分层鲁棒规划模型及其求解方法[J].中国电机工程学报,2017,37(5):1389-1400,12.基金项目
国家高技术研究发展计划项目(2014AA051901) (2014AA051901)
国家自然科学基金项目(51377111).Project Supported by National High Technology Research and Development Program of China (2014AA051901) (51377111)
Project Supported by National Natural Science Foundation of China (51377111). (51377111)