中国电力2017,Vol.50Issue(3):60-64,5.DOI:10.11930/j.issn.1004-9649.2017.03.060.05
600MW超临界CFB锅炉风道燃烧器结构改进研究
Research on Improvement of the Air Duct Burner of a 600-MW Supercritical CFB Boiler
雷秀坚1
作者信息
- 1. 四川白马循环流化床示范电站有限责任公司,四川内江641000
- 折叠
摘要
Abstract
In the commissioning stage of the 600-MW supercritical CFB boiler,the startup burner upper duct burnout may occur due to the overheating of the startup burner upper duct and,the damage of the refractory layer lined in the duct inner surface.Aiming at this phenomenon,the root cause of the fault is analyzed and the corresponding methods for improvement are proposed,such as optimizing the structure of the duct,lengthening and strengthening the inner cylinder of the burner,increasing the strength of the duct and improving the refractory material performance.The implementation of these methods has effectively prevented the occurrence of the fatdt,which ensures the ignition and startup of the boiler and can provide reference for the startup burner design of subsequent supercritical CFB boilers and the retroffing of the existing CFB boiler.关键词
600 MW/超临界CFB锅炉/点火风道/结构改进Key words
600 MW/supercritical CFB boiler/ignition duct/improvement分类
信息技术与安全科学引用本文复制引用
雷秀坚..600MW超临界CFB锅炉风道燃烧器结构改进研究[J].中国电力,2017,50(3):60-64,5.