工程科学学报2017,Vol.39Issue(3):342-348,7.DOI:10.13374/j.issn2095-9389.2017.03.004
地下金属矿山采掘作业计划优化模型
Optimization model of mining operation scheduling for underground metal mines
摘要
Abstract
To realize the accurate and scientific optimization of mining production scheduling for underground metal mines, a mathematic model based on 0-1 integer programming was constructed in view of the characteristics of mining process, such as decen-tralized production sites, complex production organization and difficulty in controlling the quality of the ore. After the requirements of economic index and spatial sequence relationship being analyzed, an optimization model was proposed which constrained by the yield balance, ore-drawing capacity and combination of high and low grade, aiming at the minimum grade deviation. The optimal mining schedule for underground mines was obtained by computer technology and integer programming to meet the operating procedure, mining sequence, production capacity and other factors. The optimization model was verified by a case in a large gold mine. The optimal solu-tion, expressed by the Gantt chart, indicates that the model is not only meaningful to guide the completion of production tasks in un-derground mine operation scheduling, but also meets the requirements of continuity and equilibrium of operation scheduling.关键词
地下金属矿山/作业计划/整数规划/计划优化Key words
underground metal mines/operation scheduling/integer programming/schedule optimization分类
矿业与冶金引用本文复制引用
李国清,李宝,胡乃联,侯杰,修国林..地下金属矿山采掘作业计划优化模型[J].工程科学学报,2017,39(3):342-348,7.基金项目
国家"十二五"科技支撑计划资助项目(2012BAB01B04) (2012BAB01B04)
国家自然科学基金资助项目(71573012) (71573012)